High Performance Two Component Handbrush Waterproof Coating for Industrial Protection Polyurea
Two Components Brushable Cold Polyurea
Product Characteristics
1. Can cure at room temperature, surface dry within 12 hours, and dry within 24 hours.
2. Excellent physical and chemical properties, with good adhesion to various substrates.
3. Convenient construction, extremely high efficiency, can achieve the design thickness requirements (hundreds of micrometers to several centimeters) in one construction.
4. Good leveling performance, overall film formation, dense and seamless coating.
5. Using manual scraping or roller coating construction, professional, convenient, and controllable.
6. Free from solvents, heavy metals, and environmentally friendly.
7. 100% solid, free of volatile organic compounds (VOCs), environmentally friendly.
8. The coating is continuous, dense, seamless, aesthetically pleasing and practical.
9. Has excellent anti-corrosion performance, effectively protecting the substrate from corrosion.
Product Parameters
| Item Number | YP683/YP685 |
| Solid Content % | 100 |
| Work time(min) | 10-15 mins |
| Surface dry time (h) | <4 |
| Actual dry time(h) | <24 |
| Hardness(Shore A) | 80 |
| Tensile strength (MPa) | 7-8 Mpa |
| Elongation at break (%) | 300 |
| Tear strength | 40N/m2 |
| Adhesion (pull)Mpa | 2Mpa |
Applications
1) Waterproofing protection for roofs, swimming pools, water parks, etc;
2) Production workshop anti-corrosion flooring and warehouse floor anti-corrosion and wear-resistant protection;
3) Silent floors in schools, hospitals, kindergartens, and dust-free workshop floors;
4) Can board sports venues such as basketball courts.
Packing
A: 20kgs/drum B:20 kgs/drum
Storage
Sealed storage of coatings in dry, cool, and well ventilated conditions, avoiding sunlight and rain, and keeping away from sources of fire.
Construction Conditions
1. Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
2. Environmental temperature and humidity requirements: The environmental temperature at the construction site should be above 5 ºC, and construction can only be carried out when the relative humidity is less than 85%.
3. Ventilation conditions: Ventilation should be maintained during construction.
Operation Methods and Requirements
1.1 A: B=1:1 (mass ratio), solvent is not allowed to be added. Before use, pour component B into a mixing bucket and add the same mass of component A by electronic weighing in proportion. Stir thoroughly for 2-3 minutes to prevent damage Uneven mixing at the bottom of the bucket resulted in local non solidification of the floor. Ready to use and prepare, the prepared polyurea coating should be used up within 15 minutes.
1.2 During construction, first layer apply solvent-free epoxy anti-corrosion sealing primer. After the primer is completely cured, polish the area to ensure inter-layer adhesion.
Reason (note: polishing floating dust must be cleaned with a vacuum cleaner). After cleaning and polishing the floating dust, use solvent-free polyurea intermediate coating combination material to mix evenly in proportion.
1.3 Afterwards, pour this combination material onto the floor and scrape it evenly with a trowel (3mm or 5mm trowel can be selected according to thickness requirements).
After 24 hours of curing, the next process can proceed. If the construction interval exceeds 48 hours, a layer of interface agent needs to be applied before construction can proceed.
1.4 After curing, if encountering adverse weather such as rain, a layer of interface agent must be applied before proceeding to the next process.
1.5 Under normal circumstances, the coating film should be cured for at least 7 days after completion of painting to ensure optimal performance of the paint film.
Suggested Use QTY
1.2kg/mm/m2,
waterproof national standard thickness 1.5mm, single square usage 1.8kg.
anti-corrosion national standard thickness 2.0mm, usage 2.4kg.
Construction steps:
FAQ
1. What products does your company specialize in?
We specialize in plastic running track materials and polyurea products. Our running track materials, made from high-quality PU and EPDM rubber, are durable, elastic, and eco-friendly, ideal for sports fields and schools. We also offer spray polyurea, brushable polyurea, self-leveling polyurea, and polyaspartic coatings for waterproofing, flooring, and corrosion protection.
2. Do you offer customized solutions?
Yes, we provide customized formulations and construction solutions tailored to meet specific project requirements.
3. Are your products environmentally friendly?
Absolutely. All our products comply with international environmental standards, using eco-friendly raw materials that are non-toxic and pollution-free.
4. What are the main applications of polyurea?
Polyurea is ideal for roofing waterproofing, industrial equipment anti-corrosion, tunnel lining, sewage tanks, and parking lots. It provides excellent durability, waterproofing, and corrosion resistance.
5. What is the difference between brushable and spray polyurea?
Brushable polyurea is designed for small or intricate areas, offering easy application. Spray polyurea is better suited for large areas, ensuring high efficiency and uniform coatings.
6. Can your polyurea withstand extreme temperatures?
Yes, our polyurea products perform well under extreme conditions, maintaining stability from -40°C to 120°C.
7. Do your products resist chemical corrosion?
Yes, our polyurea has strong resistance to acids, alkalis, and salts, making it suitable for chemical plants, wastewater treatment facilities, and other harsh environments.
8. How long does the coating last after application?
When applied and maintained correctly, our polyurea coatings can last over 20 years.
9. Do you provide technical support for application?
Yes, we offer comprehensive technical support, including training, on-site guidance, and optimized solutions for your projects.
| Company Name | Shandong Century Union New Materials Technology Co., Ltd. | Country/Region | China |
| Business Type | Manufacturer/Factory | Company Size | 120 |
| Established | June 18, 2009 | ||
| Address | North of Nanling Road, East of Zidong Railway, High-tech Zone, Zibo City, Shandong Province | ||
| Main Products | polyurethane, polyurea, and water-based resins for applications in sports fields, flooring, waterproofing, corrosion protection, and protective applications. | ||
Shandong Century United New Materials Technology Co., Ltd.
Shandong Century United New Materials Technology Co., Ltd. was established on July 18, 2014. The company is registered at the area north of Nanling South Road and east of Zidong Railway in High-tech Zone, Zibo City, Shandong Province, with Lu Ling as its legal representative. Business scope includes general projects: technical services; technology development, consultation, exchange, transfer, and promotion; coating manufacturing (excluding hazardous chemicals); coating sales (excluding hazardous chemicals); synthetic material manufacturing (excluding hazardous chemicals); synthetic material sales; plastic product manufacturing; plastic product sales; sale of high-quality synthetic rubber; specialized chemical product manufacturing (excluding hazardous chemicals); specialized chemical product sales (excluding hazardous chemicals); chemical product production (excluding licensed chemical products); chemical product sales (excluding hazardous chemicals); ecological and environmental material sales; ecological and environmental material manufacturing; surface functional material sales; pigment manufacturing; pigment sales; sales of new organic active materials; dye manufacturing; dye sales; engineering and technical research and experimental development; building materials sales; lightweight building materials sales; thermal insulation materials sales (except for projects that require approval according to law, all other activities are conducted independently based on business license). Permitted projects: import and export of goods (activities may only be conducted after obtaining approval for projects that legally require it). Shandong Century United New Materials Technology Co., Ltd. has outward investments in two companies.
